Flooring and Tiling
Flooring and tiling start with preparing the surface, ensuring it is clean, level, and stable. Tiles or floorboards are measured, cut, and laid according to the desired pattern, then fixed with adhesive or mortar. Spacers maintain even gaps for grout, which is applied after installation. For wooden or laminate floors, boards are often acclimated to the room’s humidity before installation. Sealing and finishing protect the floor from moisture and wear. Attention to alignment, spacing, and leveling ensures a functional, long-lasting, and visually appealing result.